Fidelity - Jacksonville, FL

Fidelity - Jacksonville, FL

This project consisted of the $10million build-out of a data center which had to be operational in four weeks, with the build-out of 105,000sf of office space within the balance of the 16 week schedule.  Included in this project, Cork-Howard installed a 1,500kw generator with power distribution and UPS; two 20-ton CRAC units on redundant loops off rooftop dry coolers; and the addition of an 80-ton air cooled rooftop unit, designated for 30,000sf of call center.

 

 