Special Procedures

Special Procedures

This project included the installation of the Special Procedures Operating Suites in a former laboratory area.  The new installation involved modifying the floor slab at the MRI suite to accommodate the chiller and electrical lines for the new magnet.  The exterior wall of the hospital was opened to allow placement of the actual MRI unit.  Complicating factors included leveling of the concrete floor slab inside the MRI room, which was almost two inches out of level, and arriving within tolerance for the composite steel floor beneath the MRI magnet.  The project was completed on time and the finished quality was not compromised in spite of a very tight schedule.

 